Calculation will run with almost 2-fold (Dual Core) or 4-fold (Quad-Core) the speed.
Calculation will run up to 16-fold the speed. (Requires multiple networked sufficient PCs; Special Installation knowledge required.)

In this form, one of the previously handled projects can be selected. Double Click acts as Click on the OK button.
New projects are always added to the top of the list. If the list exceeds 30 items, the last item will be deleted. In addition, one can delete items manually to keep the list simple.
A date far in the past indicates an item, which was not accessible at the time the entry was created. The file might reside on a removable drive.
See also: Operation within the tables
© 1981-2011 Petersen & Kade, all rights reserved